OUR DESIGN AND BUILD PROCESS

 Planning Stage

  • Preliminary meetings between the client & our designer to establish the design requirements.
  • Our team will perform a site audit to study the space, verify site measurements, take photos and investigate the M&E systems.
  • Our designers will provide preliminary test-fits and space plans.
  • Upon approval of test-fit, ARID Builders will prepare an (LOA) Letter of Appointment to be signed and accepted by the client, prior to moving further to the design stage.
  • Upon acceptance of the LOA, we will conduct an assessment with building management and (QP’s) Qualified Personnel for submission and vetting purposes.

Design and Presentation Stage


  • Our Designers will prepare Mood Boards, 3D visuals, Materials, Furniture and Finishes selection for presentation and clients approval.  
  • After the approval of all the Interior Design requirements. Our (QS) Quantity Surveyors and Designers will work closely on the (BQ) Bill of Quantities and finalize the cost with the client.
  • Once the final cost has been approved and the contract has been signed off, ARID will proceed with the construction and implementation on site.

Construction Stage

  • ARID Builders will prepare a detailed schedule in MS Project outlining the roll-out, renovation and completion timeline of the project for the client.
  • Upon approval of the schedule, ARID will perform submission of construction drawings, risk assessment, method statement, (CAR) Contractors all-risk insurance and other required documents to building management for (PTW) Permit to Work Application.
  • Upon approval and receipt of PTW, the actual office / retail renovation work will commence, site marking will be performed to confirm the actual layout and construction work will commence thereafter
  • Toolbox and Safety meetings are held between all vendors and sub-contractors involved in the project.
  • Regular site meetings will be held onsite between our (PM) project manager and the client representative during the course of construction to ensure client satisfaction and compliance with plans and specifications.
  • Any additional items or (VO) variation order on site will be listed and approved on a client requisition form and billed separately.

Completion Stage

  • Once all the works have been completed on-site, Our PM and the client representative will conduct a joint site walk around to check for workmanship and spot defects if any for rectification prior to the handover.
  • After all rectification works have been performed, ARID will handover the completed renovation work to the client ready for occupancy.
  • ARID will issue a Practical Completion Certificate to the client with a 6-month defects liability period for workmanship and defects.
  • ARID will prepare and submit as-built plans and post-construction documents to building management copied to the client for full compliance.
  • We will keep a project track record (Form-D) for (BCA) Building Construction Authority accreditation and registration of the completed project. 

OUR CLIENT LIST

  • Digital Realty (Nasdaq: DLR)
  • Mott MacDonald (Singapore)
  • Conversant Solutions Pte Ltd
  • ABB Pte Ltd
  • Raffles Institution
  • Keppel FMO Pte Ltd
  • Orica Singapore Pte Ltd
  • Strike Marketing Pte Ltd
  • Tiger Global Pte Ltd
  • Soggiorno Fine Furniture
  • Harbor MSP Pte Ltd
  • ISA Serviced Apartments Pte Ltd
  • OCS Services Pte Ltd
  • Satomas Pte Ltd
  • Softlayer Pte Ltd (an IBM company)
  • Soon Thong Construction Pte Ltd
  • Coastal Electronics Pte Ltd
  • Exsto Asia Pte Ltd
  • Eames Consulting Group
  • CEDS Sportswear
  • SCH Prime
  • Eyechamp (Flagship Store)
  • JTC (Cleantech One)
  • EDI Singapore
  • Spring Singapore
  • Accuron Technologies
  • Dornier Medtech GMBH
  • NFM Technologies
  • Commvault Systems Singapore
  • Wacom Singapore Pte Ltd
  • RMA Contracts Pte Ltd
  • RMA Consulting Group
  • EarthStream Global Pte Ltd
  • Stirling Andersen Insurance
  • Empired Singapore Pte Ltd
  • Daishin Engineering Pte Ltd
  • Infosing Pte Ltd
  • LawAsia International Lawyers
  • Dovre Group (Singapore) Pte Ltd
  • Allsland Pte Ltd
  • Eat Right Pte Ltd
  • Shopmatic Pte Ltd
  • Galaxy Enterprises Pte Ltd
  • Foodscape Holdings (SMOR)
  • Associated Foreign Exchange (Singapore)
  • EMIA (Merging Markets Investment Adviser)
  • Mystic Garments Pte Ltd
  • Hoa Phat Trading International Pte Ltd
  • MullenLowe Singapore
  • Brightcove (Singapore) Pte Ltd
  • Innoven Capital Singapore Pte Ltd
  • CEPSA – MOPU Holdings Pte Ltd
  • CenturyLink Technology Singapore Pte Ltd
  • LHN Group Pte Ltd

PAST PROJECTS GALLERY